Ground screws and mounting system in a PV solar park
Ground screws · Solar parks

Ground Screws for Solar Parks and Ground Mounted PV

The fastest foundation for ground mounted systems, agrivoltaics and megawatt scale solar farms, and the gentlest on the soil: no excavation, no concrete, ready to bear loads immediately and fully removable at the end of the operating life. PILLAR manufactures the ground screws and the matching substructure in house.

1.2 to 2.2 mtypical installation depth in solar parks
up to 30 tload capacity per screw
up to 12 mlength, up to 169 mm diameter
ISO 1461hot dip galvanised, min. 75 µm
up to 100 yearsservice life
Why ground screws

The right foundation for ground mounted PV

In a solar park, the foundation determines construction time, cost and whether a project can be permitted. Ground screws are turned directly into the ground and the substructure can be mounted immediately afterwards. There is no curing time, no excavation and no concrete to be transported onto the site.

Compared with concrete foundations, ground screws are usually significantly cheaper. And because they can be removed completely, the land remains unsealed and can return to agricultural use at the end of the operating life.

No concrete, no excavation

Minimal intervention in the soil, no sealing, and the natural water flow is preserved.

Ready to bear loads immediately

The substructure is mounted directly after the screws are set. This noticeably shortens construction time.

Fully removable

At the end of the operating life, the foundations are simply unscrewed. This matters for leased land and permits.

Even on rock

On rock and very stony ground, we install the ground screws after pre drilling.

Process

From soil survey to finished substructure

1

Soil data

A soil survey and pull out tests on site show how the ground will carry the loads.

2

Design

On this basis, we define the length, diameter and spacing of the screws to suit the substructure.

3

Installation and assembly

The screws are installed by machine with hydraulic drivers, on rock after pre drilling. The racking is then mounted straight away.

Comparison

Screwing, ramming or concrete?

Ground screwRammed pileConcrete foundation
Construction timevery short, load bearing immediatelyshortlong, curing time required
Impact on soilminimal, no excavationlowhigh, excavation and concrete
Stony ground / rockpossible with pre drillingoften difficultpossible
Dismantlingcomplete, reusablelaboriousvery laborious
Costusually significantly cheaper than concretedepends on the projecthigh
PILLAR PSG-2K substructure for ground mounted PV

Foundation and racking from a single source

In addition to ground screws, PILLAR also manufactures mounting systems for ground mounted PV. Both are matched to each other and delivered ready for assembly.

View mounting systems for ground mounted PV

PILLAR ground screws

Agrivoltaics and leased land

With agrivoltaics and leased land, what counts is that the soil remains usable. Ground screws seal nothing and can be removed without residue at the end of the operating life.

All ground screws at a glance

Downloads

Catalogues for your planning

PILLAR ground screw product catalogue

Ground screw product catalogue

Head types, diameters and lengths, load capacities by soil type, installation methods and references (PDF, English).

Download catalogue
PILLAR catalogue of mounting systems for ground mounted PV

Ground mounted PV catalogue

Mounting systems and substructures for ground mounted PV and solar parks, matched to our ground screws (PDF, German).

Download catalogue
FAQ

Frequently asked questions about ground screws in solar parks

How deep are ground screws installed in a solar park?

In solar parks and ground mounted PV systems, the installation depth is typically between 1.2 and 2.2 m. The exact length is determined by soil surveys, pull out tests and the loads from the substructure.

Do ground screws work on stony ground or rock?

Yes. On rock and very stony ground, the hole is pre drilled before the ground screw is set. This allows even difficult sites to be founded reliably.

How much do ground screws cost compared with concrete?

Ground screws are usually significantly cheaper than concrete foundations. The advantage comes mainly from the short construction time and from eliminating excavation, formwork and concrete. We prepare a specific quote based on your project data.

Does a solar park need a soil survey?

Yes, we recommend a soil survey and pull out tests on site. They form the basis for a safe and economical design of every screw.

Can the foundations be removed at the end of the operating life?

Yes. Ground screws are simply unscrewed again. The land remains unsealed and can return to agricultural use. This is a strong argument, especially for leased land and in the permitting process.

Does PILLAR also supply the substructure?

Yes. PILLAR manufactures ground screws and mounting systems for ground mounted PV from a single source. Foundation and substructure are matched to each other and delivered ready for assembly.

Planning a solar park?

Send us the location, size and any available soil data. We will assess the foundation and prepare a quote for foundations and substructure.

Enquire about your project

Our references

Certificate EN 1090-1 factory production controlCertificate EN 1090-2 welding certificate up to EXC 2Certificate DIN EN ISO 3834-3 quality requirements for welding
Quality

Certified to European standards

TÜV ThüringenAudited by TÜV Thüringen, accredited by DAkkS

EN 1090-1Factory production control
EN 1090-2Welding certificate up to EXC 2
DIN EN ISO 3834-3Quality requirements for welding

    Contact us quickly and without obligation

    Do not hesitate to get in touch. We will deal with your enquiry as quickly as possible and get back to you.